How to Buy New Construction in Palm Beach County

Buyer Intelligence

How to Buy New Construction in Palm Beach County

Nikko Karki
Nikko Karki August 18, 2026
A new house in Palm Beach County is usually sold on the same contract as a used one. The standard As Is contract was written for resales, and it treats a completed spec home as a property the buyer takes in its present condition. Everything that protects a buyer of new construction sits in three places: the rider we negotiate, the inspection period, and the builder's warranty attached as an exhibit. This is the path we walk with clients, from the offer to the tenth year. It is drawn from a contract we wrote this month for a completed spec home in a gated community in Palm Beach Gardens. The 59-page warranty that came with it is the second source. None of it is legal advice. It is the practical side of a purchase, written from the agent's chair, and every document in it is read with the buyer's attorney.
Deposit, in two steps
10%
Five percent at contract, five after inspections
Inspection period
15 days
The only unconditional exit
Warranty years
1, 2, 10
Workmanship, systems, structure
Florida's outer limit
7 years
The statute of repose on defect claims
From the offer to year ten
The milestones of a new-construction purchase on this month's contract, in days to closing and years after it, with the three warranty tiers drawn to the same scale.
From the offer to year ten, the milestones of a new-construction purchaseUNDER CONTRACT, IN DAYSAFTER CLOSING, IN YEARSyr 1yr 2yr 5OfferContract, deposit oneInspection ends, deposit twoWalk-through, closingMonth 11 checkYear 2 checkYear 10THE THREE WARRANTY TIERSWorkmanship, one yearSystems, two yearsStructure, ten yearsFrom the offer to year ten, the milestones of a new-construction purchaseOfferday 0Contract, deposit oneday 3Inspection period ends, deposit twoday 15 and 16Walk-through and closingday 34 and 35Month eleven inspectionmonth 11Year two systems checkmonth 23Structural cover endsyear 10
  • Workmanship tier, closing to year one
  • Systems tier, closing to year two
  • Structural tier, closing to year ten

Source: the contract, rider and warranty exhibit for a completed spec home in Palm Beach Gardens, August 2026

Before the Offer

Most new homes in our markets are spec homes. A builder or a developer buys the lot, builds to its own plans and sells the finished house, often through a single-purpose company formed for that one project. The certificate of occupancy is usually issued before the listing goes live, so the buyer is buying a finished product with a short history. Pre-construction condominiums are a different contract and a different article.

Before we write an offer we gather the documents that say what was built and who stands behind it. The certificate of occupancy and the permit history show that the house was finished and closed out as approved. The as-built survey and the elevation certificate show what sits where and how the house rates for flood insurance. The selling company's filings show who the builder is, because the warranty will be that builder's promise and not the selling company's. The association documents show the dues and the rules. On this month's contract the annual dues ran to five figures, which is ordinary for a gated community in the Gardens.

The Contract and the Rider

The contract was the standard Florida As Is form, the same one used for a forty-year-old house. The price was paid in cash with no financing contingency. The deposit came in two steps: 5 percent within three days of signing and another 5 percent on day sixteen, the day after the inspection period closed. Closing was set about five weeks out. The seller designated the closing agent and paid for the owner's title policy, which is the custom in Palm Beach County.

The form gives a buyer of new construction almost nothing specific to new construction. The rider does. Ours ran to ten clauses, and the table sets out what each one did. Three matter most. The seller had to deliver the builder's warranty form within seven days. A warranty acceptable to the buyer had to be agreed before the inspection period ended, with every manufacturer and subcontractor warranty assigned at closing. The seller had to close every open permit, cure any code violation and deliver the contractor's final payment affidavit before closing. And the buyer could assign the contract to an entity he controlled, or to his spouse, to hold title the way his advisers chose.

What the standard contract leaves out, and what the rider adds
The clauses of this month's rider, in plain language
← Scroll to see all columns →
ClauseWhat it does for the buyer
Seller's documents, in five daysThe as-built survey, the elevation certificate, the plans and approvals, the certificate of occupancy, every warranty, the insurance certificates with last year's premiums, and the landscaping, pool and alarm contracts
Inspection periodThe right to cancel for any reason or none, with the deposit returned
Seller's remediesIf the buyer defaults the seller keeps the deposit and nothing more. No suit to force the sale
Builder's warrantyThe form within seven days, a warranty acceptable to the buyer agreed before the inspection period ends, assigned at closing
Manufacturer warrantiesThe roof, appliance and equipment warranties assigned at closing
Permits and liensOpen permits closed, code violations cured, notices of commencement ended, a final payment affidavit from the contractor
CleaningPersonal property removed and the house professionally cleaned before closing
AssignmentThe buyer may assign to an entity he controls or to a spouse, to hold title as advised

Source: the rider to a Florida As Is contract for a completed spec home in Palm Beach Gardens, August 2026

The Inspection Period

Fifteen days is the buyer's only unconditional exit, so the work is front-loaded into it. A full inspection of a new house is different from an inspection of an old one. The inspector is checking the builder's work against the plans rather than looking for wear. The roof is walked by a roofer. The stucco is checked for cracks and for clearance above the soil. The drainage is watched after rain. Every system is run, and the serial numbers of the equipment are recorded for the manufacturer registrations. The elevation certificate is read against the flood zone, because the contract lets a buyer walk away within twenty days if the lowest floor sits below the flood elevation.

The warranty review happens inside the same fifteen days, with the attorney. The rider made the warranty's form a condition agreed before the period ended, which is the only moment a buyer has leverage over its terms. The first question is who the warrantor is, the builder or the selling company. The second is whether the ten-year structural promise is insured by a third party or rests on the builder alone. The third is what the standards say and which items are limited to a single repair. The answers change the price a buyer is willing to pay, and sometimes the decision to proceed.

The Walk-Through and Closing

The contract allows a walk-through on the day before closing to confirm the house is as it was. On new construction it is also the cosmetic deadline. The warranty covers chips, scratches, stains and paint only if they were written down before closing, and a condition the buyer knew about at closing is never covered. So the inspector walks the house again with the buyer, and every cosmetic item goes onto a written punch list that the builder signs, with a date for each repair. Items the builder cannot finish before closing are covered by a holdback at closing or by a credit on the price.

Closing on a new house carries three documents a resale does not. The first is the contractor's final payment affidavit with the termination of any notice of commencement. Florida lets subcontractors and suppliers lien a property for ninety days after their last work. The second is the set of assignments of the builder's warranty and every manufacturer warranty, signed at the table. The third is the elevation certificate, which the buyer's insurer wants before the policy binds. Taxes are prorated on the prior year's bill. On a newly built house that bill reflected the land alone, so the first full bill on the finished house arrives the November after closing. Our Palm Beach Gardens tax article shows what that bill looks like.

After Closing: the 1-2-10 Warranty

The builder's limited warranty arrived as an exhibit to the contract, 59 pages long. It covers workmanship for one year, the mechanical systems for two and the structure for ten, and each number is a separate promise with its own list. For one year the builder warrants the workmanship of the items on a forty-page schedule of standards, from grading and stucco to cabinets and paint. For two years it warrants the plumbing, the wiring and the mechanical equipment as installed. For ten years it warrants the load-bearing frame only. The list names foundations and footings, beams, girders and lintels. It also names columns, load-bearing walls, roof framing and floor systems. An item not on a list is not warranted.

The standards are measured, and the picture below shows three of them at true size. Hairline cracks in stucco and drywall are normal and excluded. Many items carry a one-time repair, after which the builder has no further duty. The exclusions run longer than the coverage. Appliances and equipment belong to the manufacturer, which is why the rider assigned those warranties. Landscaping, irrigation and pools have no coverage. Storm damage and flood are the owner's insurance. Mold, termites and rot are excluded outright, and so is any condition that has not yet caused physical damage.

How big is a covered crack
The widths at which the warranty's standards start to apply, drawn at true size. Anything narrower is normal settling and is not a claim.
The crack widths at which the warranty starts to apply, drawn at true size1/16 inchPlaster1/8 inchStucco, drywall,wood floor gaps1/4 inchFootings, garage slab,cabinet warp, door warpone inch at true size on most screensThe crack widths at which the warranty starts to apply, drawn at true size1/16 inchPlaster1/8 inchStucco, drywall,wood floors1/4 inchFootings, slab,cabinets, doorsone inch at true size on most screens

Source: the workmanship and structural standards of the warranty exhibit

Who pays for what
Eighteen parts of a new home and who is responsible when one fails: the builder under one of the three tiers, the manufacturer, the owner, or the owner's insurer.
Who pays for each part of a new home: the builder by tier, the manufacturer, you, or your insurerBUILDERYEAR 1BUILDERYEAR 2BUILDER10 YEARSMAKERWARRANTYYOUYOURINSURERStucco cracks over 1/8 inchRoof leak in normal weatherDrywall cracks over 1/8 inchWood floor gaps over 1/8 inchCabinet doors that warpFaucet that leaksExterior paint that peelsPlumbing pipe that leaksWiring that trips under loadFoundation that tiltsLoad-bearing wall that cracksAir conditioning unitWater heater and appliancesRoof tiles in a hurricaneFlood damagePool, irrigation, landscapingCondensate lines, caulk, guttersMold, termites, rotWho pays for each part of a new home: the builder by tier, the manufacturer, you, or your insurer1210MYIStucco cracksRoof leak, normal weatherDrywall cracksWood floor gapsCabinet doors warpFaucet leaksPaint peelsPipe leaksWiring tripsFoundation tiltsBearing wall cracksAC unitWater heater, appliancesRoof tiles, hurricaneFlood damagePool, landscapingCondensate, caulk, guttersMold, termites, rot
  • 1, 2, 10: the builder, under the one-year, two-year or ten-year tier
  • M: the manufacturer's warranty
  • Y: you, as maintenance or an exclusion
  • I: your insurance

Source: the coverage, standards and exclusions of the warranty exhibit

A claim exists only on paper. The owner sends the builder's notice form naming the defect and the date it was first seen, never later than thirty days after the relevant term ends. The builder answers within thirty days and completes workmanship and systems repairs within sixty, unless the work needs longer. The builder chooses whether to repair, replace or pay. Its total obligation is capped at the original sales price, consequential losses are waived, and disputes go to mediation and then binding arbitration with no jury. The warranty transfers to every later owner for the remainder of each term, which makes the booklet part of the resale file.

The claim clock
A claim exists only on the builder's form. The window to send it closes thirty days after the term ends, then the builder's own clocks start.
The claim clock: the filing window after a term ends, the builder's answer and the repairWarranty term1, 2 or 10 yearsFile30 dayslast day tosend the formAnswer30 daysthe builderrepliesRepair60 daysrepairscompleteTHE TERMThe claim clock: the filing window after a term ends, the builder's answer and the repairThe warranty term runs1, 2 or 10 yearsLast day to send the form30 daysThe builder answers30 daysRepairs complete60 days

Source: the claims procedure of the warranty exhibit

The Calendar We Keep

In the week after closing the owner registers every manufacturer warranty, because the builder has stepped away from the equipment. Month eleven brings a full inspection before the workmanship year ends, and month twenty-three a systems check before the second year ends. Every claim goes on the form, by a method that proves delivery, and a copy goes in the file. The owner keeps the drainage, the caulk, the condensate lines and the gutters as the document requires, since neglect voids the cover. The booklet stays with the house. Buyers working through our buyer services get this calendar at contract, and the same reading applies to the homes on our new developments pages.

What New Costs, and What It Returns

New construction commands a premium here, and it is measurable. In Admirals Cove, where we have the deepest record, new single-family homes closed at a median of $2,050 per square foot in 2024 and 2025. All single-family sales there closed at $1,607, so the premium ran 32 to 40 percent by year. Over the full period from 2020 the premium blended to 29 percent across 48 new-construction sales. Homes from the 2018 and 2019 cohort have held most of that premium as they aged, which is the evidence that a well-built spec home keeps its price. The full study is our Admirals Cove new construction analysis.

Florida's Backstop

Three facts about Florida law shape the practical choices, and the attorney confirms how each applies to a given contract. Florida does not require a written new-home warranty, and a written limited warranty can narrow the protections a buyer would otherwise have, which is what this one does. The written document is the coverage. The construction defect statute sets outer limits on any claim: four years from discovery and seven years from the certificate of occupancy. The legislature cut that seven from ten in 2023. And Chapter 558 of the Florida Statutes expects an owner to give the builder written notice and a chance to repair before anything goes further. The arbitration clause makes that academic for most owners.

None of this replaces the rider, the inspection period or the warranty. It sets the outer edge of what an owner can do when all three fail. The practical protection sits in the documents gathered before the offer, the punch list signed before closing, the month-eleven inspection and the file of written notices.

Bottom Line

A new house is bought on a resale contract, so the protection has to be written into the rider. It carries the documents, the permits, the warranty and the right to assign. The inspection period is the only unconditional exit and the only moment of leverage over the warranty. The walk-through is the cosmetic deadline. After closing the 1-2-10 warranty covers workmanship for a year, systems for two and the frame for ten, and the calendar keeps each window open.

For a buyer of new construction in Palm Beach County: Negotiate the rider before you sign. Read the warranty inside the inspection period, with your attorney. Treat the walk-through as a deadline, and inspect again in month eleven.

The contract is a Florida As Is Residential Contract for Sale and Purchase with a ten-clause rider. It was written in August 2026 for a completed spec home in a gated community in Palm Beach Gardens. The warranty is the 59-page 1-2-10 limited warranty attached to it as an exhibit. The parties and the builder are not named, and neither are the address and the price. The terms described are those of this transaction. Other builders' contracts and warranties differ, and a buyer's own documents govern.

The new-construction premium is from our Admirals Cove study of 361 sales from 2020 to 2026. Florida law points are the 2023 amendments to section 95.11 of the Florida Statutes, Chapter 558 on pre-suit notice, and Chapter 713 on construction liens. This article describes the practical considerations from a real estate agent's side of the table. It is not legal advice, and nothing in it replaces the buyer's attorney, who reviews the contract, the rider and the warranty before they are signed.

A Florida As Is contract, rider and 1-2-10 limited warranty exhibit, Palm Beach Gardens, August 2026.

Palm Beach Luxury, New Construction vs. Resale in Admirals Cove, May 2026.

Florida Statutes section 95.11(3)(c) as amended by Senate Bill 360 (2023), Chapter 558 and Chapter 713.

Nikko Karki
Written by

Nikko Karki

Nikko Karki holds an M.Sc. in economics from Helsinki School of Economics and has been in real estate for nearly two decades. He spent his early career on the developer side at Related Group in West Palm Beach, running the analysis behind the region's largest luxury projects. He has since worked on residential, commercial, and hospitality projects across the U.S., Europe, and Southeast Asia. He built this platform so that buyers and sellers could have better real estate outcomes through better analysis, for free.
About our team →
Frequently Asked Questions
Usually, yes. A completed spec home is sold on the standard Florida As Is contract, the same form used for resales. The buyer takes the house in its present condition after the inspection period. The protection specific to new construction comes from a rider to that contract and from the builder's limited warranty attached as an exhibit.
The seller's documents within days, including the as-built survey, the elevation certificate, the certificate of occupancy and every warranty. The right to cancel during the inspection period for any reason. The builder's warranty in a form agreed before the inspection period ends, and every manufacturer warranty assigned at closing. Open permits closed and a contractor's final payment affidavit before closing. And the right to assign the contract to the entity that will hold title.
One year of workmanship on the finishes and fittings, two years on the plumbing, electrical and mechanical systems, and ten years on the load-bearing structure. Each tier has its own list of covered items and measured tolerances. If an item is not on the list, it is not covered. Appliances, landscaping, pools and storm damage are excluded, and cosmetic items are covered only if they were noted before closing.
Taxes are prorated at closing on the prior year's bill, which on a newly built house reflected the land alone. The buyer then pays the first full bill on the finished house the November after closing, at the assessed value of the completed home. In Palm Beach Gardens that bill runs about 1.79 percent of the purchase price.
Palm Beach Luxury

Every article we write is built on the same research we use to advise our clients. If anything here sparked your interest, we'd welcome a conversation.

Start a Conversation