The Condo Delivery Calendar: 1,834 Residences, Year by Year

New Developments

The Condo Delivery Calendar: 1,834 Residences, Year by Year

Nikko Karki
Nikko Karki November 4, 2026
Sixteen announced luxury condominium projects will add 1,834 residences to Palm Beach County by 2031, and the calendar is lumpy. More than six hundred arrive in 2028 alone. Only one project delivers after 2029, and no announced building delivers in 2030 at all. For a buyer the calendar is the strategy. The year you need the keys decides which doors exist, what they cost and how much company you will have at closing. This piece puts every announced delivery on one page, prices each year's doors as reported, and shows the bridge for anyone who cannot wait.
Announced Residences
1,834
Sixteen projects through 2031
Deliver in 2028
606
The pipeline's peak year
Deliver in 2030
0
The hole after the wave
Corridor Resales Last Year
49
The absorption yardstick

The Calendar, Complete

The county's announced pipeline runs from the Forte handover, already trading as resales, to Mandarin Oriental’s 2031 tower in Northwood. Between them sit fourteen projects whose delivery years cluster hard. The table below is the whole field on one page.

The Delivery Calendar, 2025 Through 2031
Every announced project, as reported by its developer in November 2026. Delivery years slip. Entries are asking figures, not recorded sales.
← Scroll to see all columns →
DeliversProjectWhereUnitsReported entry
2025Forte on FlaglerSouth Flagler41Delivered, resales
2026AlbaNorth Flagler55Delivered, from $2.8M
2026CarettaJuno Beach95From $2.5M
2026Ritz-Carlton ResidencesPalm Beach Gardens106From $3.8M
2027Glass HouseBoca Raton28From $2.7M
2027Mr. C ResidencesDowntown WPB146From $1.6M
2027ShorecrestNorth Flagler98From $3.2M
2027South Flagler HouseSouth Flagler108From $8.5M
2028OlaraNorth Flagler275From $1.7M
2028Ritz-Carlton ResidencesNorth Flagler138From $3M
2028The BerkeleyDowntown WPB193From $1.9M
2029Banyan Tree ResidencesDowntown WPB88From $1.9M
2029EdgeworthSouth Flagler184From $5.5M
2029Nora HouseNora District117From $2M
2029Residences at The Boca RatonBoca Raton75From $5M
2031Mandarin OrientalNorthwood87From $3.5M

Source: developer announcements and sales materials, read November 3, 2026. Our development pages carry each project's full sheet.

Read the units column with the entry column. The cheap doors and the big unit counts arrive together in 2028, which is what makes that year the calendar’s pivot.

The 2028 Wave and the 2030 Hole

The 2028 cohort is 606 residences, and 413 of them land on the same two miles of Flagler waterfront. The yardstick for absorbing that is the corridor’s own resale record: the delivered towers along the route cleared 49 sales in the past year. New buildings sell on different terms than resales. The comparison still frames how unusual that year will be.

The Wave, Mapped
Announced residences by delivery year and area. 2030 is empty.

The calendar above, developer-announced schedules.

The other side of the wave is the hole. Nothing is announced for 2030, so a buyer who wants new keys that year is choosing between 2029 stragglers and the 2031 Mandarin. The calendar’s gaps are as tradable as its peaks: scarce delivery years tend to protect the buildings that own them.

What Each Vintage Costs at the Door

Entry pricing does not climb with the calendar. The widest spread belongs to 2027, where Mr. C opens under $2 million on the same calendar page as South Flagler House at $8.5 million. The 2028 wave is the cheapest vintage on average, which is the volume discount stated plainly.

What Each Vintage Asks at the Door
Reported entry prices by delivery year, lowest to highest project entry. The 2031 Mandarin opens at a reported $3.5M.
Entry price ranges by delivery year$1M M$3M M$5M M$7M M$9M M2026 deliveriesthree projects3.82.52027 deliveriesfour projects8.51.62028 deliveriesthree projects3.01.72029 deliveriesfour projects5.51.9Entry price ranges by delivery year$1M$3M$5M$7M$9M2026$3.8M$2.5M2027$8.5M$1.6M2028$3M$1.7M2029$5.5M$1.9M
  • 2026 · 3.8
  • 2026 · 2.5
  • 2027 · 8.5
  • 2027 · 1.6
  • 2028 · 3.0
  • 2028 · 1.7
  • 2029 · 5.5
  • 2029 · 1.9

Developer-reported entry pricing, November 2026.

Every number above is a developer’s ask. The only vintages with recorded truth are the delivered ones, and that record is the bridge.

The Bridge: Buying Finished Instead

A buyer who needs keys before 2028 has a real market today. Alba recorded nine closings in its first resale year at nearly $2,000 a foot, with the townhome printing $2,335. Our Alba ledger shows every one. Forte’s first resale cleared about $2,300 a foot against asks that now run to $5,254, mapped in the Forte analysis.

The nearest test case is under way in the Gardens. The Ritz-Carlton Residences there began delivering this year on fourteen Intracoastal acres. A 2026 buyer can weigh that finished branded product against the paper flags downtown before committing three years out. The comparison is free and the paper developers know it.

The delivered buildings price the paper ones. When a 2028 tower asks less per foot than Alba trades at today, the discount is the carry and the risk of three years on a schedule. The flagship guide prices every delivered building the same way.

Bottom Line

Sixteen announced projects deliver 1,834 residences through 2031, with 606 in 2028 and none in 2030. Entries run from under $2 million to $8.5 million and every pipeline figure is a developer ask. The delivered buildings carry the only recorded prices, and they are the yardstick for every contract signed on paper.

For a buyer working backward from a move-in year: Pick the year, read its row, then price the delivered alternative before signing. The calendar tells you what exists. The resale record tells you what it is worth.

Delivery years, unit counts and entry pricing are developer-reported figures read November 3, 2026 from sales materials and announcements. Schedules slip and prices move. Treat every pipeline figure as an ask.

Corridor absorption (49 resales) is BeachesMLS recorded closings for the twelve months through October 2026 across the delivered towers along and near the Flagler corridor, deduplicated.

Alba and Forte figures are recorded closings from the same window, as published in our building ledgers.

Developer sales materials for the sixteen projects, November 2026.

BeachesMLS recorded closings via our licensed feed.

Nikko Karki
Written by

Nikko Karki

Nikko Karki has worked in real estate for nearly two decades, beginning on the developer side at Related Group in West Palm Beach, then through private real estate investments and cross-border M&A across the U.S., Europe, and Southeast Asia. He holds an M.Sc. in economics from the Helsinki School of Economics. He built Palm Beach Luxury to make his analysis available to anyone in the market, for free.
About our team →
Frequently Asked Questions
Three projects: Alba on North Flagler (55 residences, delivered and trading), Caretta in Juno Beach (95 residences) and the Ritz-Carlton Residences in Palm Beach Gardens (106 residences).
The 2028 cohort is the peak: 606 announced residences, led by Olara with 275, The Berkeley with 193 and the Ritz-Carlton Residences West Palm Beach with 138. Most of it lands on the Flagler corridor.
No announced project delivers in 2030. The calendar runs 2029 deliveries from Banyan Tree, Edgeworth, Nora House and the Residences at The Boca Raton, then jumps to Mandarin Oriental in 2031.
Reported entries run from about $1.6 million at Mr. C Residences to $8.5 million at South Flagler House. Every pipeline figure is a developer asking number. The delivered buildings carry the recorded prices, led by Alba at nearly $2,000 a foot in its first resale year.
Palm Beach Luxury

Every article we write is built on the same research we use to advise our clients. If anything here sparked your interest, we'd welcome a conversation.

Start a Conversation